Project Details

North Greece Road Bridge Replacement

North Greece Road Bridge Replacement over Northrup Creek
North Greece Road Bridge Replacement over Northrup Creek
Before replacement

Project Scope

  • Prepared contract documents to replace existing steel beam bridge with a pre-cast concrete bridge.
  • Bridge spanned 34 feet over Northrup Creek tributary and reduced upstream flooding.
  • Project included limited channel clearing.
  • Prepared hydrologic and hydraulic analyses and calculations, engineering reports, plans, contract specifications, permits, detour plans and public meeting presentations.
  • Town of Clarkson Highway Department performed construction work.
  • This project was awarded APWA Project of the Year for Structures less than $2 Million.
  • The County performance review after the project’s conclusion rated our work the highest possible score in both Design and Construction Service Phases.

Client: Monroe County Department of Transportation

Project Type: Hydrologic and Open Channel Hydraulic Analysis

Engineers: Joe Ardieta, John Knapp

Budget: >2 Million

Recent Projects

Helena Group Street Rehabilitation

Construction Administration

For City of Rochester

Sager Drive

Construction Administration

For City of Rochester

Wellington Woods North

Multi-Residential Site Design

For ODS Management Group

Get in Touch

Have a question about an ongoing project or have a project we might be a good fit for? Send us a message using the form or give us a call directly.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.