Project Details

Redman Road Culvert Replacement

2014 image of east face

Project Scope

  • Prepared drawings and contract documents to replace the deteriorating three-sided concrete culvert over West Creek.
  • Culvert spanned 10’ x 70’ long at a slight skew to the road. Wing walls were installed at the east end of the culvert.
  • Prepared hydrologic and hydraulic analyses and calculations, engineering reports, drawings, construction cost estimate, contract specifications, permits, detour plans and presented at public meetings.
  • Benefited community from a safety perspective by reducing upstream flooding and financially by utilizing surplus materials in Monroe County stockyard.
  • Construction cost originally estimated at $114,000, but actual cost was 20% under pre-project budget. Work performed by Town of Clarkson Highway Department.

Client: Monroe County Department of Transportation

Project Type: Hydrologic and Open Channel Hydraulic Analysis

Engineers: Joe Ardieta, John Knapp

Recent Projects

Helena Group Street Rehabilitation

Construction Administration

For City of Rochester

Sager Drive

Construction Administration

For City of Rochester

Wellington Woods North

Multi-Residential Site Design

For ODS Management Group

Get in Touch

Have a question about an ongoing project or have a project we might be a good fit for? Send us a message using the form or give us a call directly.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.